QuickBooks Job Costing for Construction: What Works and What Doesn't
QuickBooks can support basic job costing, but contractors quickly encounter limitations. This guide explains how to maximize QuickBooks Online's job costing capabilities and when supplemental systems become necessary.
QuickBooks Job Costing for Construction: What Works and What Doesn't#
Executive Summary#
QuickBooks Online can track costs by project—that's the good news. The challenging news: QuickBooks Online's "Projects" feature was designed for general business project tracking, not construction job costing. This guide explains how to get the most from QuickBooks Online's job costing capabilities and where supplemental systems or workarounds become necessary.
What QuickBooks Online Offers for Job Costing#
The Projects Feature#
QuickBooks Online's Projects feature allows:
- Creating projects (jobs) within the system
- Assigning income and expenses to specific projects
- Basic profitability reporting by project
- Time tracking assigned to projects
For contractors coming from no job costing at all, this represents meaningful improvement. Costs and revenue associated with specific jobs become visible, rather than blended into company-wide totals.
What Works#
Expense Assignment:
When entering bills or expenses, you can assign them to projects. Material purchases, subcontractor invoices, and other direct costs can be tracked by job.
Invoice Tracking:
Invoices created for projects link automatically. Revenue by project is straightforward.
Time Tracking:
QuickBooks Online's time tracking feature allows hours to be logged against projects. For basic labor cost tracking, this provides some visibility.
Project Profitability Reports:
Built-in reports show revenue, costs, and profit by project—useful for basic performance assessment.
Where QuickBooks Online Falls Short#
No Cost Code Structure#
Construction job costing requires cost codes—breaking down job costs into categories that enable analysis and control:
What's Needed:
- Labor by phase (rough-in, finish, service)
- Materials by system or area
- Equipment by usage type
What QuickBooks Online Offers:
Flat project structure. All costs assigned to a project land in the same bucket. Breaking down "labor" from "materials" requires using QuickBooks Online's account structure, not project-level cost codes.
Workaround:
Use Classes or Tags to add dimensions, but this creates reporting complexity and doesn't provide true cost code functionality.
No Budget Comparison#
What's Needed:
Budget entered by cost category with actual vs. budget comparison as work progresses.
What QuickBooks Online Offers:
No native project budgeting. You can track actuals but can't compare against plan within QuickBooks Online.
Workaround:
Maintain budgets in spreadsheets, export QuickBooks Online actuals, create comparison manually. This works but is labor-intensive and disconnected.
Delayed Information#
What's Needed:
Real-time job cost visibility. If Monday's labor was over budget, know it Tuesday.
What QuickBooks Online Offers:
Costs appear when transactions are entered—typically when timesheets are processed (weekly or bi-weekly) or when bills are entered (often after receipt, sometimes much later).
Result:
Job cost reports lag actual work by days or weeks. Project managers see historical data rather than current position.
Labor Costing Limitations#
What's Needed:
Labor costs reflecting fully-burdened rates (wages plus employer costs), allocated to cost codes based on time worked.
What QuickBooks Online Offers:
Time tracking captures hours. Payroll captures costs. Connecting them to produce accurate labor cost by project by cost code is manual work.
Challenges:
- Time entries may use different categories than job cost needs
- Burden rates aren't automatically applied
- Union payroll complexity exceeds QuickBooks Online capability
Equipment Cost Gaps#
What's Needed:
Owned equipment usage charged to projects at internal rates reflecting true cost.
What QuickBooks Online Offers:
No equipment tracking. No internal rate application. Equipment costs either stay in overhead or require manual journal entries to allocate.
Work-in-Progress Accounting#
What's Needed:
For percentage-of-completion accounting, tracking costs incurred against estimated total cost, computing completion percentage, and recognizing revenue accordingly.
What QuickBooks Online Offers:
No WIP tracking. Progress billing for invoicing is manual. Completion percentage calculation happens outside QuickBooks Online.
Maximizing QuickBooks Online for Job Costing#
Account Structure#
Design your chart of accounts to support job cost reporting:
Cost of Goods Sold / Direct Costs:
- Labor - Direct
- Materials
- Subcontractor
- Equipment
- Other Direct Costs
These accounts, combined with project assignment, give basic cost category breakdown by job.
Consistent Transaction Entry#
Job costing accuracy depends on consistent assignment:
Best Practices:
- Always assign project before saving transactions
- Use Purchase Orders to pre-assign job before bills arrive
- Review unassigned transactions regularly
Class Utilization#
QuickBooks Online Classes can add reporting dimension:
Possible Use:
- Classes for project phases (rough-in, finish)
- Classes for cost types (if not using accounts)
- Classes for work areas
Limitation:
Single class per transaction (in some QuickBooks Online versions). Can't apply both phase and type simultaneously.
Regular Reconciliation#
Without automated validation, errors accumulate:
Monthly Review:
- Transactions without project assignment
- Transactions assigned to wrong projects
- Timing differences between accrual and cash
When to Supplement QuickBooks Online#
Indicators You've Outgrown Basic QuickBooks Online Job Costing#
Spreadsheet Proliferation:
If job cost management requires multiple spreadsheets maintained alongside QuickBooks Online, the workaround has become the system.
Delayed Discovery:
If you discover project problems weeks after they develop, information timing isn't supporting management needs.
Missing Information:
If common questions ("How many labor hours on Project A's rough-in phase?") can't be answered without significant research, visibility is inadequate.
Administrative Burden:
If producing job cost reports consumes hours weekly, the manual effort isn't sustainable.
Supplementation Options#
Option 1: Construction-Specific Operations Platform
Systems designed for construction that integrate with QuickBooks Online:
- Field timesheets that code to jobs and phases
- Real-time job cost visibility from field data
- Equipment tracking and internal rate application
- Budget comparison and variance reporting
QuickBooks Online remains the accounting system; the platform provides construction operations layer.
Benefit: Preserves QuickBooks Online familiarity while adding needed functionality.
Option 2: Full Construction Accounting System
Replace QuickBooks Online with accounting software designed for construction:
- Job costing built into accounting
- WIP accounting capability
- Construction-specific reporting
Consideration: Significant change management, accountant familiarity concerns, and potential over-complexity for smaller contractors.
Option 3: Enhanced Manual Processes
More disciplined spreadsheet systems with regular QuickBooks Online exports:
- Structured templates
- Defined update frequency
- Clear accountability
Reality: Works for very small operations but doesn't scale and remains labor-intensive.
Integration Considerations#
When supplementing QuickBooks Online, integration quality matters:
What Should Sync#
Payroll Data:
- Labor costs by employee
- Hours by project (for job costing)
- Deductions and withholdings
Accounts Payable:
- Bills entered in either system
- Payment status
- Job allocation
Accounts Receivable:
- Invoices (especially if billing is generated outside QuickBooks Online)
- Payment applications
Integration Quality Factors#
Reliability:
Does data sync consistently, or do gaps require manual investigation?
Timing:
Does sync happen in real-time, daily, or less frequently?
Mapping:
How are cost codes, projects, and accounts mapped between systems?
Error Handling:
When sync fails, is it obvious? Can it be corrected?
Red Flags#
Manual Export/Import:
If "integration" means exporting CSV files and importing them, it's not really integrated.
One-Way Only:
If data only flows one direction, discrepancies accumulate.
Occasional Sync:
If syncing requires manual initiation or happens infrequently, systems drift apart.
How Appello Extends QuickBooks Online Job Costing#
Appello connects field operations to QuickBooks Online through maintained integration. Timesheets completed on mobile devices capture time by job and cost code, flowing into job costing immediately. When timesheets sync to QuickBooks Online payroll, labor costs allocate correctly without re-entry.
The integration preserves QuickBooks Online as the financial system of record while adding the real-time job costing visibility and cost code structure that QuickBooks Online alone can't provide. Budget comparison, variance reporting, and equipment cost allocation happen in Appello, with financial data syncing to QuickBooks Online for accounting purposes.
For ICI subcontractors committed to QuickBooks Online for accounting, Appello provides the construction operations layer that makes job costing actually work.
Conclusion#
QuickBooks Online can support basic job costing—tracking costs and revenue by project—but construction's more sophisticated needs exceed its native capabilities. Cost code structures, budget comparison, real-time visibility, and equipment costing require either extensive workarounds or supplemental systems.
The right approach depends on your situation. Very small contractors may manage with basic QuickBooks Online job costing plus spreadsheets. Growing contractors typically need construction-specific systems that integrate with QuickBooks Online, gaining needed functionality while preserving accounting system familiarity.
Related Reading:
Related Articles
How to Supercharge QuickBooks Online for Construction
QuickBooks Online handles accounting well but wasn't built for construction operations. This guide explains how ICI subcontractors can extend QuickBooks Online's capabilities to support job costing, field operations, and progress billing.
Progress Billing for Subcontractors: Maximizing Cash Flow
Progress billing converts completed work into cash flow, but many ICI subcontractors under-bill or bill late. This guide explains how to maximize cash flow through effective progress billing practices.
Job Costing Fundamentals for ICI Subcontractors
Job costing is the foundation of profitability management for ICI subcontractors. This guide explains the fundamentals of tracking costs by project, common pitfalls, and how accurate job costing improves both current projects and future estimates.
Ready to Transform Your Operations?
See how Appello can help your ICI contracting business.
Book a Free Demo