WIP report construction software
Your WIP report, as of any date. No spreadsheet.
Appello's WIP report lists every awarded job as of the date you pick, with contract, billed to date, cost to date, cost to complete, percent complete, gross profit and over or under billing worked out for you. It is built for owners and controllers at ICI trade contractors, and it is live in Appello today, with PDF and CSV export.
App screens use a fictional sample company. The real report runs wider than this; some columns are cropped to fit.
Nothing on it is typed in twice
A WIP schedule is only as good as the four numbers on each row. In a spreadsheet, someone pulls them from three systems and pastes them together. In Appello, they come from the work your crews and office already record: hours approved on Friday, bills coded on Tuesday, the invoice sent at month end.
So the report you run on the first of the month is the job as it stood on the last day, not as someone remembered it a week later.
- 1Revised contract
Won estimate + change orders
The original contract is the won estimate. Every change order won by the as-of date is added on top, so a CO approved on the 28th is in the month it was won.
- 2Cost to date
Approved timesheets, bills and equipment time
Labour at the rate each worker was paid, supplier bills and expenses coded to the job, and equipment time at internal cost. Only approved records dated on or before the as-of date count.
- 3Cost to complete
The job's latest forecast
The project manager's forecast of what is left. When a job has no forecast yet, Appello falls back to the estimate, so a new job still lands on the report.
- 4Billed to date
Progress invoices
Every invoice on the job up to the as-of date, read the way your invoice settings say, including whether holdback counts.
Over or under? Watch it worked out
These are the WIP report's own formulas, run on four sample jobs as of August 31. Pick a job, then drag its forecast. A bigger cost to complete lowers percent complete and earned profit, and an underbilled job can tip into overbilled. That is why a stale forecast makes a WIP report lie, and why Appello reads the latest one.
The inputs, as of Aug 31
Lakeshore General · Wing B
- Revised contract
- $388,300
- Billed to date
- $222,260
- Cost to date
- $227,500
- Cost to complete
- $97,500
- Step 1Total expected cost$227,500 cost to date + $97,500 to complete$325,000
- Step 2Percent complete$227,500 ÷ $325,00070%
- Step 3Expected gross profit$388,300 revised contract − $325,000$63,300
- Step 4Earned profit to date70% × $63,300$44,310
- Step 5Earned to date$227,500 cost + $44,310 earned profit$271,810
- Step 6Underbilled$271,810 earned − $222,260 billed to date$49,550
Fictional sample jobs. Percent complete is rounded to two places before earned profit, as the report does. Across all four jobs on Aug 31: $63,608 underbilled, $30,600 overbilled, net $33,008 underbilled.
Month end takes a morning
The work that makes a WIP report right happens during the month, in the field and in the office. The report itself is a date and a button.
Last week of the month
Office and project managers
Timesheets, supplier bills and equipment time get approved. Project managers update the forecast on any job where the finish has moved.
First business day
Controller
Run the report as of month end. Read the summary cards first: net under or over billings, average gross profit, and jobs below zero.
Same morning
Controller and PMs
Open the overbilled and underbilled jobs. Underbilled usually means an invoice is late. Overbilled means cash has run ahead of the work.
Quarter end
Owner
Export the PDF or CSV and send it to your accountant, bank or surety. Run last quarter again beside it to show the trend.
Underbilled: money you have earned
Cost plus earned profit is ahead of what you have invoiced. Usually a late progress claim or an approved change order not billed yet. On the sample, Lakeshore is $49,550 underbilled: the next invoice should catch most of it.
Overbilled: money you owe in work
You have invoiced more than the work has earned. Front-loaded billing does this, and it feels like profit until the crew has to do the work without the cash. Huron is $30,600 ahead on the sample.
The 27 columns your surety reads
The screen shows the 16 columns you check every month. The CSV export carries all 27, in the underwriter-style work-on-hand layout bonding companies and banks ask for. The PDF is a clean copy for the meeting.
Bond number, contract type and comments come from fields you already keep on each job. Map them once in settings and every export fills them in.
Pure job borrow is the one people ask about: how far billings run past cost plus the job's whole expected profit. It is cash the job has lent you, and the crew still has to earn it.
What you put in
From the job, the estimate, approvals and invoices.
- Job name
- Customer
- Location
- Bond number
- Contract type
- Original contract amount
- Original estimated total cost
- Start date
- Expected completion date
- Revised contract amount
- Billed to date
- Cost to date
- Estimated cost to complete
- Comments
What Appello works out
The same formulas on every job, every month.
- Total expected costs
- % complete
- Estimated gross profit margin
- Gross profit %
- Expected GP (in progress)
- Actual GP (completed)
- Earned profit to date
- Profit to recognize
What the bank and surety look for
The over and under billing story.
- Underbillings
- Overbillings
- Billing in excess of cost
- Cost in excess of billing
- Pure job borrow
Or just ask for it
Appello works natively with Claude, ChatGPT, Microsoft Copilot and Grok through the Appello connector (MCP). Ask in plain words and the assistant runs the same report, with the same numbers, limited to the jobs your Appello role lets you see. Sample answers below use the fictional jobs.
Run the WIP as of August 31 and list every job more than $10,000 underbilled.
One job: Lakeshore General · Wing B, underbilled $49,550. It is 70% complete by cost and has $222,260 billed against $271,810 earned.
Appello tool: get_wip_report
Why is Huron showing overbilled?
Huron is 35% complete by cost: $182,000 spent of $520,000 expected. That earns $214,200, and $244,800 has been billed, so it is $30,600 ahead of the work.
Appello tool: get_wip_report
What's our total backlog and margin across all open jobs?
A single rollup of contract value, cost to date, gross invoiced and margin across every job you are allowed to see, grouped by job, project or customer if you ask.
Appello tool: get_portfolio_financial_summary
Which jobs flipped from underbilled to overbilled between July and August?
The assistant runs the report twice, as of July 31 and August 31, and lists the jobs whose net position changed sides, with both figures.
Appello tool: get_wip_report
Agent playbook · Month-end WIP pack
When it runs
First business day of the month, after the office has closed approvals for the month before.
What the agent does
Runs get_wip_report as of month end. Flags jobs over or under billed past your threshold, jobs with gross profit below zero, and jobs whose forecast has not moved in a month (get_cost_to_complete). Drafts a one-page note for the controller.
What a person signs off
The controller reads the note, fixes any stale forecast with the PM, and decides what goes to the bank or surety. Nothing leaves the business without them.
You can delegate the work, but not the responsibility for it.
From a contractor running Appello
“I love having this dashboard of all our projects. It's like my little command center. I don't know how I would do it any other way to be honest.”
Darren Sloan, President, All Temp. Read the case study
less administrative overhead
All Temp, Toronto, Ontario
Questions controllers ask about WIP
How does Appello work out percent complete on the WIP report?
By cost. Appello divides cost to date by total expected cost, which is cost to date plus the estimated cost to complete. Cost to complete comes from the job's latest forecast, or from the estimate when there is no forecast yet. Earned profit is that percent times the job's expected gross profit, and over or under billing follows from there. Keep the forecast current and every column moves with it.
Can I run the WIP report for a past date?
Yes. Pick any as-of date. The contract counts only the estimates and change orders won by that date, and cost and billing count only what is dated on or before it. Run last quarter again and you get last quarter's numbers, which is what your accountant, bank or surety wants to compare against this quarter.
What counts as cost to date?
Approved labour from timesheets, approved bills and job expenses, and approved equipment time, all at internal cost and dated on or before the as-of date. Nothing counts until it is approved. That is the same cost the job's financial summary and job cost report use, so the WIP report never disagrees with the job.
Does billed to date include holdback?
It follows your invoice settings. Billed to date comes from the job's invoices up to the as-of date, and your business settings decide whether holdback counts toward revenue. Set it once and the WIP report, the job cost report and the financial summary all read billing the same way, so the over and under billing figures match what your accountant sees.
Can I send the WIP report to my bonding company?
Yes. Export it to PDF or CSV. The CSV carries 27 columns in an underwriter-style work-on-hand layout, including bond number, contract type, start and expected completion dates, billings in excess of cost, cost in excess of billings and profit to recognize. Bond number, contract type and comments come from fields you already keep on the job, once you map them in settings.
Does it include finished jobs?
By default, yes. Untick Include completed jobs to see only running work. A job counts as completed when its estimated cost to complete is zero. The summary cards show net under or over billings, average gross profit on running and finished jobs, and how many jobs have a gross profit below zero, so a money-losing job is the first thing you see.
Who can see the WIP report?
Only people whose Appello role allows it. The WIP report needs the report permission or financial summary access, and a person limited to their own projects sees only those jobs. The same limits apply when someone asks an AI assistant for the report through the Appello connector, so nobody gets numbers through Claude or ChatGPT they could not open in the app.
Where the WIP report fits
The parent module
Construction job costing software
Budgets, actuals, forecasts and every cost the job carries, for insulation, mechanical, HVAC, plumbing, sheet metal, electrical, concrete and other ICI trade contractors.
See Job Financials →- Job cost report →Budget against actual, cost code by cost code.
- Change orders →The revised contract, priced and approved.
- Holdback invoicing →What each customer is holding, job by job.
Next in the month
Bill the underbilled job
Underbilled usually means an invoice is waiting. Set percent complete and the progress invoice drafts itself.
Progress billing →Read: cost to complete for owners who aren't accountantsRun your WIP on your own jobs
Bring last quarter's WIP schedule. We'll show you the same jobs in Appello, as of the same date, with the forecasts that drive them.
See your WIP in a demoA working session on your own week: your crews, your payroll rules, your jobs. Pricing for your team size afterwards.
- I want to know where we standTake the 6-minute readiness scorecardScores payroll, job cost, scheduling, safety and how connected your systems are, which is the groundwork AI needs. You see your score in each area and a demo agenda built from your answers.
- I want a quick benchmarkScore your operationSix minutes, five scored areas, and a report you keep, whether or not you ever book a demo.
- I want the big pictureSee how Appello connects AIHow your operations data, your integrations and assistants like Claude and ChatGPT fit together.