Concrete contractor software

Concrete contractor software for forming crews

Set it. Pour it. Strip it. Bill it.

Appello is the field-to-office system for concrete forming, foundation and flatwork contractors who run their own crews. It turns quotes into jobs, puts every crew and form set on one schedule, lets foremen enter the whole crew's hours, and tracks cost by footing, wall and slab.

Three tradespeople in Built For The Trades caps on a truck tailgate at a construction site at dawn
Built For The Trades brand imagery. The screen is Appello's job schedule grid. App screens use a fictional sample company.

Every element is a cost code

Know which pour made money

Your quote already breaks the job into footings, walls, floors and extras. Keep the same breakdown on the job. When the foreman splits the crew's hours and the office codes the supplier bills to the same lines, budget against actual tells you which element ran over, while there's still time to price the next one differently.

grade123456789

Simplified section, not to scale. Cost codes are examples; use your own.

  1. 1

    Footings 110

    Form, place and strip. The foreman's hours, the concrete and rebar bills, and any pump time land here.

  2. 2

    Walls 120

    Form sets, ties and the crew that stands them. The usual place a job wins or loses money.

  3. 3

    Window bucks 130

    Small, fiddly and easy to forget on the quote. Its own line means it gets priced and billed.

  4. 4

    Basement floor 210

    Placing and finishing crews, the concrete, and the finisher's machine hours.

  5. 5

    Poly and gravel 220

    Vapour barrier and base: material from supplier bills, labour from the crew split.

  6. 6

    Garage floors and pads 230

    Flatwork at grade, often a separate visit with a separate crew.

  7. 7

    Piers and sonotubes 310

    Counted per pier on the quote, tracked per pier on the job.

  8. 8

    Porch tops and steps 320

    Builder-specific details that cause back-charges when they don't reach the crew.

  9. 9

    Winter heat 900

    Heaters, blankets, hoarding and fuel. Tracked so it's billed, not absorbed.

How a concrete forming contractor runs

Fast quotes, moving crews, and the weather

Concrete is a volume business with a short clock. Quotes go out in days, crews move every day or two, and the pour waits on the inspector, the truck and the forecast. Here's the business Appello has to fit.

How you win work

  • Quotes for home builders and general contractors, priced off drawings: Division 03 work, from forming and accessories (03 10 00) to cast-in-place concrete (03 30 00) and finishing.
  • Residential production work can mean several houses a day, quoted in days, not weeks. Builders expect fast turnaround.
  • On a commercial job several builders often bid the same project, so you price it once per builder and track each as its own quote.
  • Quote requests come in every way at once: a shared inbox, personal emails, phone calls and paper plans dropped off at the counter.

What's on the quote

  • Footings, walls, pads, piers and sonotubes, window bucks, basement floors, garage floors, porch tops, poly, and winter heat.
  • Some jobs are flatwork only; repairs and marine or civil work get priced differently again.
  • Pricing often follows union zone rates by location, with travel sub-zones on top.
  • Each builder has its own requirements. If they aren't on the quote sheet, they don't reach the crew.

Who's on the crew

  • A foreman, form setters, labourers and finishers. Pump and boom operators are often hired in, and ready-mix comes from a supplier.
  • Crews move to a new site every day or two. The foreman usually clocks in the whole crew, and labourers may never open an app.
  • Union shops work under carpenters' and labourers' agreements that vary by region; open shops set their own scales. Driving pay and passenger time follow their own rules.
  • Scheduling often lives with one operations person and a magnet board.

Weather and season

  • A pour waits on the inspection, the ready-mix truck, the pump and the forecast. Rain or cold moves it, and the crew moves with it.
  • Cold weather means heaters, blankets and hoarding: real cost that has to be priced as winter heat.
  • Flatwork, curb and sidewalk crews are often laid off from December to April and rehired in spring, with tickets to renew.
  • Spring and fall are a rush; holiday weeks scramble the board.

Equipment that moves with the crew

  • Aluminum form sets, trucks and trailers, skid steers, heaters, generators, lasers and finishing machines.
  • Knowing which site has which form set or heater saves a morning of phone calls.
  • Rented pumps and lifts belong on the job's cost, not in overhead.

How you get paid

  • Builders pay per house or per element, often on a simple invoice when the work is done.
  • Commercial work is progress-billed against a schedule of values, with holdback (10% under Ontario's Construction Act) released at the end.
  • Extras like added steps, overpour, rock and winter heat get billed as T&M or change orders, if somebody wrote them down.
  • Billing disputes start when the builder's requirement never made it from the quote to the crew.

What gets in the way

Ten ways a good pour turns into a bad month

Paraphrased from conversations with concrete forming and flatwork contractors. The concrete is rarely the problem. The paper around it is.

  1. 01

    Paperwork that arrives two weeks late

    The crew's sheets come back to the office after the crew has moved on, so nobody can answer questions about the job.

  2. 02

    A schedule in one person's head

    The board works until that person is on holiday. Then the wrong crew goes to the wrong lot.

  3. 03

    Builder requirements lost between quote and crew

    Step heights, finishes, window sizes. Miss one and the back-charge shows up on the next payment.

  4. 04

    The same quote typed four times

    Excel template, Word quote, the master log and a folder. One manager can lose half a day to it.

  5. 05

    No idea which element lost money

    You know the job ran over. You don't know if it was the walls, the flatwork or the winter heat.

  6. 06

    Quote requests in ten inboxes

    Duplicates, addenda and missing drawings, with nobody sure which version the estimator priced.

  7. 07

    Travel and zone pay worked out by hand

    Driver pay, passenger time and zones by region, checked line by line every week.

  8. 08

    Extras that never get billed

    The crew poured an extra step or ran heaters for three days, and the invoice says neither.

  9. 09

    Form sets and heaters you can't find

    Equipment moves with the crew, and the office finds out where it went by phoning around.

  10. 10

    Paper hazard assessments on a new site every day

    A PDF filled in on the tailgate, if it gets filled in, and hard to find when someone asks.

Quote to closeout

One foundation, start to finish

Each stage of a forming job, how it really goes, and the Appello feature that handles it. Everything named here is in the product today. Appello doesn't order concrete or book pumps; it runs your people, equipment and paperwork around the pour.

The worker schedule: drag a crew member to another job or day. Leave shows before you book. App screens use a fictional sample company.
Equipment with its next inspection, last location and the job it's on. App screens use a fictional sample company.
  1. 1

    Quote

    Every request logged once

    Requests arrive by email, phone and paper. The estimator takes off quantities and prices footings, walls, floors and extras, usually in a spreadsheet, then rewrites it as a quote letter.

    In Appello

    Log each request as an estimate with a status, an estimator and a due date. Price it bid-first with one number or build it line by line with markup, overhead and tax, and send it as a branded quote letter. The estimate calendar shows what's due and what's going stale.
  2. 2

    Award

    The builder's requirements travel with the job

    The builder says yes. The job number, lot, site address and the builder's specific requirements have to reach the ops person and the crew.

    In Appello

    Turn the won estimate into a job with the customer, contact, location and PO carried across. Put the builder's requirements in the job's notes and files, so the crew sees them on the phone, not on a clipboard back at the yard.
  3. 3

    Setup

    Cost codes per element

    Footings, walls, bucks, floors, garage and porch, winter heat. The same breakdown as the quote, if anyone keeps it.

    In Appello

    Apply a cost code template for foundations or flatwork in one action, with a budget per code. Each estimate line can become a cost code on the job.
  4. 4

    Schedule

    Crews, equipment and the weather call

    Which crew is forming, which is placing, which is finishing, and where the form sets and heaters are. Then it rains.

    In Appello

    Schedule by job, by worker or by day. Book a crew by user group, copy a week, and move blocks when the pour moves. Assign equipment to the job the crew is on. Everyone sees their own schedule, with directions, in the mobile app.
  5. 5

    Pre-pour

    Hazard assessment, checklist and photos

    Before the truck arrives: the crew's hazard assessment, the forms and rebar checked, photos in case anyone asks later.

    In Appello

    Build a pre-pour checklist with photo, pass/fail and signature questions, attach it to the job and mark it mandatory with the daily hazard assessment. Each submission records the worker, job, time and GPS location.
  6. 6

    Time

    The foreman enters the crew

    Ten people, two lots, one day. Hours split between forming and stripping, with travel by zone.

    In Appello

    Foreman bulk entry fills the sheet from the crew's user group. Split hours across cost codes and jobs, add travel by zone from a versioned rate card, and submit. Geofenced clock-in is there for workers who clock themselves in.
  7. 7

    Equipment

    Hours, rates and service

    Skid steer hours, heater days, a rented pump. Equipment cost is real job cost, and machines that miss service miss work.

    In Appello

    Log equipment hours against rate cards, with per-job overrides. QR codes open the record from a phone. Maintenance thresholds on hours or distance send the reminder before the breakdown.
  8. 8

    Cost

    Concrete, rebar and pump on the right line

    Ready-mix tickets, rebar and accessories, the pump invoice. Coded to the job, if they're coded at all.

    In Appello

    Approve and lock supplier bills by job and cost code, or bulk-create them. Approved hours land on the cost codes the same day. Budget against actual per element is current without a spreadsheet.
  9. 9

    Bill

    Per house, per draw, plus the extras

    A simple invoice per house for the builder, a monthly draw with holdback on commercial work, and the extras nobody wants to argue about.

    In Appello

    Simple invoices for residential work, progress invoices from the schedule of values with holdback for commercial work, and T&M invoices generated from signed work orders for extras. Invoices push to QuickBooks Online.
  10. 10

    Close

    Know what to change on the next quote

    The job's done and paid. The question is whether the walls were priced right.

    In Appello

    The job financial summary shows contract, cost, earned and margin, and the job cost report breaks it down by cost code and month. The work-in-progress report shows over and under billing as of any date.

AI and agents

Ask before the truck rolls

Appello works natively with Claude, ChatGPT, Microsoft Copilot and Grok through the Appello connector. You sign in on Appello's own login page, and the assistant can only see and change what your Appello role allows. These are things you can ask it today, with the connector tools each one uses. How the connector works

You ask

“Who's on tomorrow's pours, and is anyone missing a ticket the site requires?”

Reads tomorrow's schedule and each worker's certification status, so you fix the crew tonight instead of at the gate.

get_schedule_for_dateget_user_certification_status

You ask

“It's raining Thursday. Move the Elm Street crew to Friday.”

Finds the crew's schedule blocks for Thursday on that job and moves them, for you to confirm before anyone is notified.

search_schedulesmove_schedule

You ask

“How did the walls on the Maple job do against budget?”

Pulls the job cost report by cost code and compares it with the budget, so you see the element, not just the total.

get_job_cost_reportget_job_financial_summary

You ask

“List supplier bills from this month that aren't coded to a job yet.”

Searches payables for missing jobs or cost codes, so ready-mix and rebar don't sit in overhead.

search_accounts_payable

You ask

“Which heaters, generators and skid steers are due for service?”

Checks each machine's recorded hours against its maintenance thresholds and lists what's due or overdue.

compute_equipment_maintenance_statussearch_maintenance_schedules

Or hand the filing to an agent

Our implementation team builds agents for one defined problem at a time and keeps them working. Two examples for a concrete contractor:

Agent playbook · Systems

Quote request intake

The problem
Quote requests land in many inboxes, by phone and on paper. Duplicates and addenda get missed, and estimators spend hours filing before they price anything.
Connections
Your shared and personal inboxes, your file server or cloud drive, and Appello (estimates, companies, contacts).
Context
Which builders you work for, how you number jobs, which folders hold what, and which requests you don't bid.
Skills
Log each new request, match it to an existing quote or builder, flag duplicates and addenda, file drawings into the job folder, and start the Appello estimate with the right builder and due date.
Cadence
Every 15 minutes in working hours.
Where a person decides
Estimators still do every takeoff and every price, and a person sends every quote.
Measured by
Hours a week spent filing and logging requests, and requests found missed.

Agent playbook · Standard

Field paperwork chase

The problem
Hazard assessments, timesheets and pour photos arrive late or never, so the office finds out two weeks after the crew has moved on.
Connections
Appello (schedule, form submissions, timesheets, job notes) and your team's text or email.
Context
Which forms each job requires, who the foreman is on each crew, and what counts as complete for the day.
Skills
Each afternoon, compare today's schedule with what's been submitted, and list for each foreman what's missing on which job.
Cadence
Daily, at 3 p.m.
Where a person decides
A person decides who gets a reminder and sends it.
Measured by
Days between the work and the paperwork reaching the office.

You can delegate the work, but not the responsibility for it.

How agent builds work · Read the white paper

Proof

Real numbers, no made-up testimonials

What a year on Appello looks like at 200 people

timesheets
22,000
worker-days scheduled
21,000
supplier bills costed to jobs
5,700
safety forms filed
2,500
jobs run
1,100
timesheet approvals a week
420

Based on usage across a sample of Appello customers, scaled to 200 people over 12 months. Rounded.

Talk to a contractor in your trade

We don't put words in customers' mouths. If you want to hear how Appello runs at a concrete contractor, ask on your demo and we'll try to set up a call with one who has agreed to take it.

Book a demo

Integrations

Your books, your payroll

Concrete contractors often run Sage or QuickBooks with a separate payroll provider. Appello sits in front: hours, bills and invoices go in once and come out as payroll files, coded payables and synced invoices.

Two-way sync

QuickBooks Online

Invoices, payments, bills, vendors, customers, expenses and timesheet hours, mapped to your jobs, tax codes and GL accounts.

File export

Payroll files

Approved hours for Sage 50, QuickBooks Desktop, Trimble Spectrum, ComputerEase, Avantage, Payroll4Construction and Dayforce Powerpay, or CSV.

Integration

Jonas Construction Accounting*

Integration approved and ready to deploy.

File export

CSV, PDF and AIA

Any list to CSV, any record to a PDF from your own template, and progress billing as an AIA G702/G703 workbook.

Native

Zapier, Dropbox Sign, Twilio

Send records to other tools without code, collect e-signatures on HR documents, and text crews from your own Twilio number.

OAuth 2

REST API

Credentials you create in Settings, for companies, contacts, jobs, estimates, change orders, invoices, payables and certifications.

* Jonas Construction Accounting: deployed when a customer needs it, as part of onboarding. Ask us about timing for your company. Procore, Sage Intacct, NetSuite and others have no direct connector; both sides have APIs, so they can be connected as a project. All integrations

Concrete contractor questions

Can Appello track cost by footing, wall and slab?

Yes. Give each element its own cost code, or apply a cost code template for foundations and another for flatwork. The foreman splits the crew's hours across those codes, supplier bills for concrete and rebar are coded the same way, and budget against actual shows which element made money and which one didn't.

How does a foreman enter time for a crew that moves sites every day?

Foreman bulk entry fills the timesheet from the crew's user group, so twelve people's hours take about as long as one. Hours can be split across cost codes and jobs, held as a draft and submitted when the day is confirmed. Labourers don't have to use the app if the foreman enters the crew.

Does Appello order ready-mix or book the pump?

No. Appello schedules your crews and your equipment, and keeps the job's notes, drawings and forms. It doesn't place orders with your ready-mix supplier or pump company. Many contractors keep the pour time and supplier on the job as a note and move the crew's block in the schedule when the pour moves.

What happens when rain or cold cancels a pour?

Move or copy the crew's schedule blocks to the new day and the crew sees the change in the mobile app. If cold weather means heaters, blankets or hoarding, add winter heat as its own line on the estimate and its own cost code, so the cost is tracked and the extra can be billed.

Can we bill extras like additional steps, overpour or winter heat?

Yes. Log the extra as a work order on the job with labour, material and equipment lines and the builder's signature, then generate a T&M invoice from it. For bigger changes, create a numbered change order that moves from draft to sent to approved and rolls into the next progress invoice.

We do several houses a day for builders. Is that too small for Appello?

No. Each house can be a standalone job, or a job under the builder's project, with a simple invoice when it's done. Builders are companies in the directory with their own contacts. Invoices push to QuickBooks Online, so a high volume of small jobs doesn't mean a high volume of typing.

Can Appello pay travel by zone or by distance?

Yes. Versioned travel rate cards pay per kilometre or per zone, and each timesheet row carries the zone. Union shops can set wage regions so the rate follows where the work happened. When the agreement changes, add a new version and keep the history of the old one.

How do we track forms, heaters, trucks and skid steers?

Register them as equipment with a category, serial and status. Print a QR code so a scan opens the record, assign equipment to the job the crew is on, check items in and out, and log equipment hours against rate cards. Maintenance schedules use recorded hours or distance to send reminders.

How do safety forms work when crews change sites daily?

Attach the forms a job needs, such as a daily hazard assessment or a pre-pour checklist you build yourself, and mark them mandatory. They appear on each worker's job card as the day's to-do. Every submission records the worker, job, time and GPS location, with photos and signatures on any question.

What about seasonal layoffs?

Deactivate workers at the end of the season and Appello clears their future schedule. Their certifications, training records and history stay on file, so when you reactivate them in spring you can see straight away whose tickets need renewing before they go back on a crew.