Small playbook
Daily seal-log check
The problem. Gaps in the seal log are found weeks later, after the ceiling has closed and the photo can't be retaken.
- 1 · Goal
- Each evening, every foreman knows which of today's seal entries are missing a photo, a system or a location.
- 2 · Connections
- Appello form submissions and jobs, and Appello notifications to foremen.
- 3 · Context
- Which fields your specs require on each job and who leads which crew.
- 4 · Skills
- Read the day's seal-log submissions, check each against the job's required fields, and send each foreman their own list.
- 5 · Cadence
- Daily, at the end of the shift.
The gate. Installers fix their own entries. The agent never edits a submission.
Measured by: Incomplete entries found at closeout, before and after.
Standard playbook
Inspection package builder
The problem. Assembling the documentation package for the GC or inspector takes days of collecting PDFs, photos, submittals and training records.
- 1 · Goal
- A complete draft package per area within an hour of the request: seal log PDFs, form report counts, the systems used, installer training records and open items.
- 2 · Connections
- Appello forms, project files, certifications and jobs; your shared drive for the finished package.
- 3 · Context
- What each GC and inspector expects, your package layout, and which submittals apply to which areas.
- 4 · Skills
- Gather the records for the area, check for gaps, assemble the package in your layout, and list what's missing.
- 5 · Cadence
- On request.
The gate. Your office reviews and sends every package. The agent never sends documents outside the company.
Measured by: Hours to assemble a package, and resubmissions requested by inspectors.