Equipment billing rates
Equipment billing rates that follow the machine onto the invoice
In Appello, each equipment category has a rate card, units and jobs can override it, and every rate carries your cost beside the bill rate. Approved equipment time is priced from the card in effect that day, counts as job cost and goes onto an equipment invoice. It's live today for insulation, mechanical, HVAC, plumbing, sheet metal, electrical, concrete and other ICI trade contractors.
Scissor Lifts · Rates
2026 Rates · Effective 2026-01-01
| Rate Type | Bill Rate | Cost | Markup |
|---|---|---|---|
| Standard | $285.00 | $160.00 | 78% |
| Standby | $140.00 | $70.00 | 100% |
| Overtime | - | - | - |
| Weekend | $340.00 | $160.00 | 113% |
| Holiday | $420.00 | $160.00 | 163% |
Daily tab shown. Fictional sample company and data.
Before and after
Equipment nobody billed
The lift sat on the T&M job for a month. The invoice listed labour and material. The rate was in someone's head.
Equipment charged out
Five approved days at the Huron rate, $1,220, on Friday's equipment invoice, with the cost beside it.
Three levels. The most specific wins.
A rate can live on the category, on one unit, or on one unit on one job. Rate schedules date each version of the card, so January's increase applies to January's time and not to last year's. Change the unit, job, rate type or date and watch which level Appello uses.
The rate Appello bills
$270.00 / day
Cost $160.00 · margin $110.00 · from 2026 Rates
- 1EQ-0142 on 26-009-01Unit + job override, set on the job's Equipment Rate Overrides$270.00wins
- 2EQ-0142 unit rateSet on the equipment recordnot set
- 3Scissor Lifts defaultSet on the equipment category$285.00
The most specific rate wins. An override without a cost uses the unit's or category's cost; if no level has one, job financials use the bill rate.
Fictional sample company and data.
See what a rate change touches before you save it
Raise Standby on Scissor Lifts from $140 to $150 a day and Appello lists every equipment time entry that would re-price, with the bill before and after, the unit, job and operator, and whether it's approved. Approved entries bill at the new rate; you can send any of them back to review from the same screen. To save, you type the confirmation. Change only a cost and invoices aren't touched.
Confirm Rate Changes
Saving re-prices 18 equipment time entries. 6 are approved and bill at the new rate even if they stay approved; 12 are in review.
| Date | Unit | Rate | Job | User | Status | Bill |
|---|---|---|---|---|---|---|
| 2026-09-10 | EQ-0147 | Standby | 26-014-01 | M. Tremblay | In Review | $140.00 → $150.00 |
| 2026-09-09 | EQ-0147 | Standby | 26-014-01 | M. Tremblay | In Review | $140.00 → $150.00 |
| 2026-09-08 | EQ-0142 | Standby | 26-009-01 | J. Alvarez | Approved | $140.00 → $150.00 |
| 2026-08-27 | EQ-0142 | Standby | 26-009-01 | J. Alvarez | Approved | $140.00 → $150.00 |
Showing 4 of 18. Type “Proceed with changes to equipment rates” to save.
A preview, not saved: the rest of this page keeps Standby at $140. Fictional sample company and data.
Equipment hours tracking
Equipment time, logged once and approved
Equipment time is logged per unit and day: the job, the operator, hours under each rate type and a cost-code split where the job needs it. The billing period and full-day billing come from the check-out, so the office doesn't re-enter how the lift is billed. Add-ons, like a bucket on a machine, get their own rows under it.
Entries move from Not Submitted to In Review to Approved; rejecting needs a reason, and approved entries are locked until someone rejects them. One switch also creates the operator's regular hours on their timesheet, and on the phone the timesheet has an Equipment Used section per job. The same approved hours run the preventive maintenance meter.
Equipment Time · week of Sep 7, 2026
EQ-0142 · 26-009-01 Huron Generating · operator J. Alvarez
| Rate type | Mon | Tue | Wed | Thu | Fri | Total |
|---|---|---|---|---|---|---|
| Standard | 10 | - | 10 | 10 | 10 | 40 |
| Standby | - | 10 | - | - | - | 10 |
Tuesday is Standby: the lift was on site but out of service after its failed inspection. Fictional sample company and data.
Approved on Friday. On the job cost and the invoice.
Only approved equipment time counts. It's valued at cost in the job's financial summary, WIP, cost to complete, monthly cost report, forecast and earned vs burned, and it's billed at the bill rate. Daily lines stay one per day; weekly and monthly rentals roll up into one line per period. Appello never swaps hours for a cheaper day rate on its own.
Equipment Breakdown
26-009-01 Huron Generating · financial summary
- Hours
- 50
- Bill
- $1,220.00
- Cost
- $710.00
- Margin
- $510.00
EQ-0142, 5 entries, week of Sep 7. Fictional sample company and data.
Create Equipment Invoice (5)
Generate Invoice| Equipment | Rate Label | Period | Billed Per | Qty | Rate | Amount |
|---|---|---|---|---|---|---|
| EQ-0142 | Standard | Mon Sep 7 | Day | 1 | $270.00 | $270.00 |
| EQ-0142 | Standby | Tue Sep 8 | Day | 1 | $140.00 | $140.00 |
| EQ-0142 | Standard | Wed Sep 9 | Day | 1 | $270.00 | $270.00 |
| EQ-0142 | Standard | Thu Sep 10 | Day | 1 | $270.00 | $270.00 |
| EQ-0142 | Standard | Fri Sep 11 | Day | 1 | $270.00 | $270.00 |
| Total | $1,220.00 | |||||
From the job's Invoicing tab: approved equipment time not yet billed. Invoices sync to QuickBooks Online.
Equipment job costing
Is the lift earning its keep?
Two numbers answer it. Per job, the Equipment Breakdown shows each unit's hours, bill, cost and margin from approved time, and whether it billed by the hour, the full day or prorated. Per asset, the cost summary adds up the supplier bills and employee expenses allocated to that unit, like the hose for Tuesday's repair, over any date range.
Field-level permissions decide who sees cost and purchase price on the equipment record. Estimates read the same rate card, so quotes start from the rates you bill. Allocating one machine across several sites is covered in our guide to equipment cost allocation across multiple jobsites.
EQ-0142 · cost summary · Sep 2026
Accounts payable · 1 bill$412.60
Employee expenses · 1$38.50
Total allocated$451.10
Lakeside Lift Service, hydraulic hose; L. Moreau, hydraulic fluid. Fictional sample company and data.
Footage from a real customer job.
“What do we bill for lift 0142 on Huron?”
Your AI assistant reads the rate cards and equipment time, and previews changes before anything is saved. Connect Claude, ChatGPT, Microsoft Copilot and Grok through the Appello connector.
“What rate do we charge for lift 0142 on Huron?”
$270 a day Standard, from the job override in 2026 Rates; Standby falls back to the category's $140.
resolve_equipment_rate“Preview a 5% increase on all scissor lift rates from January 1.”
A 2027 Rates schedule copied from 2026 with each rate up 5%, shown as a preview before anything is created.
preview_equipment_rate_schedule_changes“How many equipment hours went on Huron last week, and are they approved?”
50 hours on EQ-0142, five entries, all approved; Tuesday as Standby.
search_equipment_time_entries“What have we spent on lift 0142 this year?”
Supplier bills and employee expenses allocated to EQ-0142, with the totals and counts for each.
get_equipment_cost_summaryWorks inside your Appello role. Every call is logged. Anything that leaves the business waits for a person. You can delegate the work, but not the responsibility for it.
AI for contractorsThe Appello connectorAppello in ChatGPTHave us set it up
Questions owners and controllers ask
Can a job have its own equipment rates?
Yes. In Appello, rates start on the equipment category, can be set for an individual unit, and can be overridden for a unit on a specific job or work order. The most specific rate wins, so the negotiated rate on a T&M job never leaks into the next quote.
What happens to time already logged when we change a rate?
You see it before you save. In Appello, a rate change opens a confirmation listing every equipment time entry it re-prices, with the bill amount before and after. Approved entries bill at the new rate, and you can send any of them back to review from the same screen.
Do we track our cost as well as the bill rate?
Yes. In Appello, each rate has a bill rate and an optional cost, entered as a dollar amount or as a markup. Job financials use the cost; where no cost is entered they use the bill rate, and the screen says so.
Do operators have to log their hours twice?
No. In Appello, when the office logs equipment time with an operator, one switch also creates the operator's regular hours on their timesheet. On the phone, the timesheet has an Equipment Used section per job, so the operator records both in one place.
How does equipment time get onto an invoice?
From the job's Invoicing tab. In Appello, Create Equipment Invoice lists the approved equipment time that hasn't been billed yet, priced from the rate card, and builds the invoice from the entries you pick. Work order documents use the same pricing.
Does it replace our accounting system?
No. In Appello, rates, equipment time and equipment invoices live with the job. The invoices sync to QuickBooks Online if you use it, and depreciation and fixed-asset accounting stay in your accounting system.
Where the money goes next
Construction job cost report
Equipment cost beside labour and material, by cost code.
WIP report
Approved equipment time in cost to date.
Tool check out system
Where the billing terms are set.
Construction equipment management software
Equipment in Appello, start to finish.
Part of equipment management and job costing.
Bring your rate sheet
Send us the equipment rates you quote today. We'll load them as a rate card on a sample company and bill a week of lift time in the demo.
Price a week of equipment in a demoA working session on your own week: your crews, your payroll rules, your jobs. Pricing for your team size afterwards.
- I have one problem to fix firstSee every modulePick the problem in front of you (payroll, scheduling, job cost, billing) and see the screens that handle it.
- I want to know where we standTake the 6-minute readiness scorecardScores payroll, job cost, scheduling, safety and how connected your systems are, which is the groundwork AI needs. You see your score in each area and a demo agenda built from your answers.
- I want the big pictureSee how Appello connects AIHow your operations data, your integrations and assistants like Claude and ChatGPT fit together.
