AIA-style G702/G703 pay applications
G702/G703-style pay apps, built from the invoice you already made
Appello turns any progress invoice into a G702/G703-style pay application: one Excel workbook with the application on the first sheet and the continuation sheet on the second, built from the same schedule of values, change orders and retainage as the invoice. It is for subcontractors billing general contractors who want the AIA-style layout, and it is live today.
App screens use a fictional sample company. The export is laid out like the AIA forms; it is not the official AIA document.
AIA, G702 and G703 are trademarks of The American Institute of Architects. Appello is not affiliated with or endorsed by the AIA.
Nine lines, none of them retyped
The trouble with a hand-built pay app isn't the form. It's retyping the invoice into it every month, and carrying one mistake forward. Click any line of the application to see where it comes from on progress invoice #6.
Progress invoice #6 · job summary
- Original contract value$366,400.00
- Total approved change orders$21,900.00
- Total revised contract value$388,300.00
- Work completed to date$304,450.00
- Less amount previously billed($222,260.00)
- Gross billing this period$82,190.00
- Holdback on the invoice10%
- Less 10% holdback($8,219.00)
- Subtotal$73,971.00
- + 13% HST$9,616.23
- Amount of invoice$83,587.23
G702-style application · click a line
Line 8: Line 6 minus line 7. It equals the invoice subtotal after holdback, before tax. The invoice adds 13% HST for $83,587.23.
Fictional sample data: Northline Insulation's application #6 to Northgate Construction for Lakeshore General · Wing B, period to Aug 31, 2026.
The continuation sheet, one row per line
Sheet two lists every line of your schedule of values, then each approved change order as its own row, with a grand total. On the sample: $388,300 scheduled, $222,260 from the previous application, $82,190 this period, $304,450 completed, $83,850 left to finish and $30,445 retainage.
- AItem no.
- The SOV line number, or the change order number, such as 26-014-C013.
- BDescription of work
- Your SOV line names: Level 1 · Mechanical Room, Roof · AHU Connections.
- CScheduled value
- Each SOV line's value; each approved change order's value.
- DFrom previous application
- Completed to date on your previous progress invoice.
- EThis period
- This month's work from the percent complete you set.
- FMaterials presently stored
- Left at zero. Add stored materials in the workbook if your contract bills them.
- GTotal completed and stored
- D + E + F. Its total is line 4 of the application.
- %G ÷ C
- Percent complete for the line.
- HBalance to finish
- C − G: the work left on the line.
- IRetainage
- The invoice's holdback percentage on G, line by line.
Pay application day, every month
There is nothing extra to set up. If you bill progress invoices in Appello, you already have everything the pay application needs.
Many US general contractors, and plenty of Canadian ones on larger work, want every subcontractor's monthly claim in the same application-and-continuation layout, so their project accountant can check it line by line against the schedule of values and roll it into their own application to the owner. A claim in any other shape goes to the bottom of the pile.
Building that layout by hand is where the time goes: last month's totals copied across, change orders added as rows, retainage worked out a second time. Every retyped number is a chance to be wrong, and one wrong number carries forward into every application after it. In Appello the workbook is a by-product of the invoice you were sending anyway.
- Step 1
Month end
The PM sets this period's percent complete on the progress report. The progress invoice drafts itself, approved change orders and holdback included.
Progress Billing → - Step 2
Export
On the invoice, open Export and choose AIA G702/G703. One .xlsx file, two sheets: G702 - Application and G703 - Continuation.
- Step 3
Check, sign, send
Add stored materials if your contract bills them, sign it, and send it to the general contractor with the invoice.
- Step 4
Next month
Export again. The previous-application column and line 7 come from last month's invoice, so the numbers carry forward on their own.
How retainage is held →
What it does
- Builds both sheets from the progress invoice, nothing typed
- Lists each approved change order as its own row
- Takes retainage from the invoice's holdback percentage
- Carries the previous application forward from last month's invoice
- Fills owner, project, application number, date and period
- Exports from the invoice screen, or through the Appello connector
What it doesn't
- It isn't the official AIA document; it's laid out like it
- It doesn't bill stored materials; column F stays at zero
- It doesn't include sales tax; line 8 is before tax
- It doesn't sign or certify anything; a person at your company does
Billing a Canadian GC instead? The same invoice carries holdback the Canadian way: see holdback invoicing.
Have your assistant pull it
Claude, ChatGPT, Microsoft Copilot and Grok work with Appello natively through the Appello connector (MCP). Each answer is limited to what your Appello role allows.
You can delegate the work, but not the responsibility for it.
The assistant builds the file; your controller checks it and signs it before it goes to the GC.
- 1
“Export the pay application for progress invoice #6 on Wing B.”
The same Excel workbook the Export button makes: G702-style application on sheet one, continuation sheet on sheet two. You check it, sign it and send it.
get_job_bill_aia_export - 2
“Before I send it: does line 8 match the invoice?”
Line 8 is $73,971, the invoice subtotal after $8,219 of holdback. The invoice total of $83,587.23 adds 13% HST, which the G702 layout leaves out.
get_invoice - 3
“Which SOV lines on Wing B are less than half done?”
Just one: Roof · AHU Connections, at 10%. Level 3 · Surgical Suite is at 75%, and Levels 1 and 2 are done.
get_schedule_of_values - 4
“List every progress invoice dated in September, by job and amount.”
The month's claims in one list, so the office can see which jobs still need a pay application exported for their GC.
search_invoices
systems to run the business
R.A. Barnes Electrical in London, Ontario moved the business off six separate systems and onto Appello. When the invoice and the pay application come from the same place, there is nothing to reconcile between them. Read the case study
Questions about AIA-style pay apps
Is this the official AIA G702 and G703?
No. Appello exports an Excel workbook laid out like the G702 and G703, with the same line numbers and columns. It is not the official AIA document, and Appello is not affiliated with the American Institute of Architects. If your general contractor requires the official AIA forms, the numbers copy straight across from the workbook.
Where does the pay application get its numbers?
From the progress invoice. The original contract is your schedule of values, approved change orders are their own rows, work completed is this period's percent complete, and retainage is the invoice's holdback percentage. Nothing is typed into the workbook, so the pay application and the invoice can't disagree.
Does it bill stored materials?
No. The continuation sheet has the materials presently stored column, but Appello leaves it at zero. If your contract bills stored materials, add them in the workbook before you sign and send it. Everything else, schedule of values, change orders and retainage, comes from the progress invoice.
Why is current payment due lower than the invoice total?
Tax. Line 8 of the G702-style sheet is current payment due before sales tax: on the sample, $73,971. The progress invoice adds 13% HST on top for $83,587.23. Both start from the same $82,190 of work this period and the same $8,219 of holdback.
What happens to last month's numbers?
They carry forward on their own. The continuation sheet's previous application column comes from your previous progress invoice, and line 7, previous certificates, uses the previous invoice's retainage percentage, so a change in retainage this month doesn't rewrite what was already certified.
Can I sign it in Appello?
No. The workbook has contractor and architect signature lines at the bottom of the application sheet. Check it, sign it the way your general contractor wants, and send it. Appello builds the numbers; a person at your company signs off what goes out.
Before and after the pay app
Parent module
Progress billing software
The schedule of values, percent complete and invoices the pay app is built from, for insulation, mechanical, HVAC, plumbing, sheet metal, electrical, concrete and other ICI trade contractors.
Holdback invoicing
The retainage on line 5, held and later released.
Change orders
Approved extras, each its own row on the continuation sheet.
WIP report
Next at month end: billed against earned on every job.
Stop retyping pay apps
Bring last month's pay application. We'll build the progress invoice in Appello and export the same workbook from it.
Bill a month in a demoA working session on your own week: your crews, your payroll rules, your jobs. Pricing for your team size afterwards.
- I have one problem to fix firstSee every modulePick the problem in front of you (payroll, scheduling, job cost, billing) and see the screens that handle it.
- I want to know where we standTake the 6-minute readiness scorecardScores payroll, job cost, scheduling, safety and how connected your systems are, which is the groundwork AI needs. You see your score in each area and a demo agenda built from your answers.
- I want the big pictureSee how Appello connects AIHow your operations data, your integrations and assistants like Claude and ChatGPT fit together.