Material requisition app for construction

The material the crew asked for, on the job, with a date on it

A material order in Appello is the crew's request, kept on the job: what's needed, priced by size from your price book, when it's needed by and how urgent it is. Purchasing sees every open request in one list. Built for insulation, mechanical, HVAC, plumbing, sheet metal, electrical, concrete and other ICI trade contractors, and in Appello today.

Before: a text thread

need more of the big pipe wrap for 3rd floor + mastic

which size? which job? when?

lakeshore. same as last time. asap

  • No size, no quantity, no date.
  • Nothing on the job when the bill shows up.

App screens use a fictional sample company and data.

From the ask to done

Each order takes the job's number plus the next in line, so 26-014-01-4 is the fourth request on Wing B. It lives on the job's tab and in the company-wide list.

  1. AS

    Put it on the job

    Order Name, the job, a Required By date and time, and a priority. Lines come from the price book by size, so the 4" × 1.5" is never confused with the 2" × 1".

  2. RE

    Purchasing sees it

    The Material Orders list shows every order with its job, project, status, dates and cost. Notes and photos ride along on the order.

  3. BU

    Write the PO from it

    Purchasing writes the supplier purchase order from it, priced from what that supplier charges, or pulls what's already in stock.

  4. CL

    Set the status

    Move the order from Requested to Pending, Backorder or Completed. The list and the job's tab show where every request stands.

Change the order. Then look at it as the foreman.

Adjust quantities and the line totals and order cost follow. Set the status and priority from your company's own lists. Then switch to a foreman without cost permission: same order, no supplier pricing.

26-014-01-4 · Level 3 Corridor HW piping

26-014-01 Lakeshore General · Wing B · Ordered by M. Tremblay · Required By Mon 14 Sep 2026, 7:00 AM

RequestedHighOrder Cost: $13,718.00
Order lines
MaterialSizePart #QtyUnitUnit costTotal
Fibreglass pipe insulation · ASJ4" × 1.5"FG-ASJ-0415
620
lf$15.40$9,548.00
Fibreglass pipe insulation · ASJ2" × 1"FG-ASJ-0210
300
lf$7.10$2,130.00
Aluminum jacketing 0.016"36" × 100'AJ-016-36
6
roll$212.00$1,272.00
PVC fitting cover 90°2"PVC-90-2
80
ea$4.80$384.00
Mastic5 galMS-5G
4
pail$96.00$384.00

Unit costs come from the price book, size by size. Order Cost is the sum of the lines. Fictional sample company and data.

Back orders and line status

What's still owed is counted off the truck

A material order says what the job needs. What the supplier still owes is counted where it's known: on the supplier purchase order, when the delivery is received. Each PO line shows ordered, received, damaged and back order, with a Back-Ordered badge until the rest arrives.

Damaged units stay on the back order, a revised delivery date goes on the PO line, and the order's status can read Backorder so the crew can see their request is waiting. The construction purchase order software page walks through a partial delivery.

SPO-0042 receiving tab, Wednesday 9 Sep. App screens use a fictional sample company and data.

From the tech's work order to an order, in one click

Technicians log the material a service call needs on their work order from the Appello mobile app. In the office, tick the lines and choose Create Material Order. Each line remembers its order, and if someone tries to request it twice, Appello asks first: Already requested, or Request again.

See work orders →

Ask what's been requested, and by when

Your assistant reads material orders and their lines through the Appello connector, and can draft one for a person to finish.

“What material orders for Lakeshore are due before Monday, and which are still Requested?”

Each order on 26-014-01 with its required-by date, status and cost, oldest first.

search_material_orders

“Draft next week's order for Huron from what's left on the estimate.”

A material order on 26-009-01 with lines and quantities, for a person to check and adjust before anything is bought.

create_material_order · add_material_order_item

“Which lines across all open orders call for 2-inch PVC fitting covers?”

Every open line for that item and size, by job and quantity, so purchasing can buy it once.

search_material_order_items

Works inside your Appello role. Every call is logged. Anything that leaves the business waits for a person. You can delegate the work, not the responsibility.

Works with Claude, ChatGPT, Microsoft Copilot and Grok. The Appello connector · Appello in ChatGPT · AI for contractors · Help building an agent

What's in the product today

Orders numbered by jobRequired By date and timeYour own statuses and prioritiesLines priced from the price bookCost hidden without permissionNotes and photos on the orderExport PDFOrders list across all jobsCreate Material Order from a work orderBack orders counted on the supplier PO

Questions foremen and purchasing ask

Can a foreman put in a material request from the Appello mobile app?

Not directly. In Appello, material orders are entered in the web app, which a foreman can use from a laptop or tablet in the site trailer. Technicians on a work order log materials from the mobile app, and the office turns the lines they choose into a material order with Create Material Order.

Does a material order track back orders line by line?

No, the supplier PO does. In Appello, a material order is the request: lines, quantities, a required-by date and an order status, which you can set to Backorder. The quantities still owed are counted when the supplier PO is received: ordered minus good, with a Back-Ordered badge and a revised delivery date on the PO line.

Can I change the statuses and priorities?

Yes. In Appello, order statuses and priorities are lists your company owns. Appello starts you with Requested, Draft, Pending, New, On Hold, Backorder and Completed, and five priorities from Highest to Lowest. Rename them, add your own or retire the ones you don't use, and the list and job views follow.

Who can see what the material costs?

Only people you allow. In Appello, each line is priced from your catalog, but the unit cost, line totals and order cost show only to roles with permission to view material order costs. A foreman can request exactly what the crew needs without seeing your supplier pricing.

Does a material order send itself to the supplier?

No. In Appello, a material order is the internal request. Export PDF gives you a clean copy to share, and purchasing writes the supplier purchase order from it, priced from what that supplier charges you. The PO is what gets emailed to the supplier as a secure link and received when the truck shows up.