Construction cost codes software

One list of cost codes. Every dollar on the right line.

Appello gives every job the same cost codes from a template you build once. Crews split their hours across them, the office codes bills to them, and equipment time and stock land on them too. It is for owners, controllers and project managers at ICI trade contractors, and it is live in Appello today.

Or start with the readiness scorecard or the white paper.

A template applied to a job, drawn from the codes on Wing B. Fictional sample company and data.

Before and after a standard cost code list

Every PM's own codes

  • “Pipe” on one job, “210” on the next, “misc labour” on the third.
  • Hours averaged across the job because the timesheet had no code.
  • Two jobs that can't be compared, so the next bid is a guess.

One standard list

  • The same numbers on every job, from one template.
  • Hours, bills, equipment and stock on the line they belong to.
  • Jacketing on this job beside jacketing on the last five.

Where every dollar lands

A cost code is only useful if cost actually reaches it. In Appello, five kinds of record carry a job and a code from the moment they are entered. Pick one and see where it goes on Wing B. Nothing counts until it is approved, and nothing is typed in a second time.

M. Tremblay, foreman, on the phone

Worker
R. Singh · Journeyperson
Day
Tue Sep 8 · 8.0 h
Split
6.0 h → 210 · 2.0 h → 410
Status
Approved Fri Sep 11

The split is made where the work happened. When the week is approved, each part lands on its own code at the worker's paid rate.

Cost-code time →

26-014-01 Lakeshore General · Wing B · costing codes

  • 210 - Pipe insulationlands here
    Actual $113,400Budget $148,000

    + 6.0 h at the rate he was paid

  • 320 - Duct wrap
    Actual $80,400Budget $96,000
  • 410 - Jacketing
    Actual $33,700Budget $54,000
  • 510 - Firestopping
    Actual $0Budget $22,000

Actual cost to date as of Aug 31, 2026: $227,500 across four codes. Fictional sample company and data.

Build the list once. Use it on every job.

Cost code templates live in Settings. A template has a name, a description and its lines: number, name, unit, GL details and spec labels. Keep one for each kind of work you do.

  1. 1 · In Settings

    Write the template

    Your numbers, your names. The controller owns it, so 410 means jacketing on every job for years.

  2. 2 · On the new job

    Apply it

    The codes arrive on the job with values at zero. Add or rename a code when this job's scope is different.

  3. 3 · From the estimate

    Fill in the money

    Set each code's value and total cost, or generate the lines from the won estimate and let the numbers come across.

Generating lines from an estimate is covered on the schedule of values page.

Bill the way the GC wants. Cost the way you work.

The general contractor wants Wing B billed floor by floor. Your foremen think in scopes: pipe, duct, jacketing. In Appello, each cost code is marked for billing, for costing or for both, so one job carries both views without a spreadsheet in between.

Billing lines carry the customer's value and drive the progress invoice. Costing codes carry the budget your crews are measured against. A small job can use one set of codes for both.

Billing · what Northgate sees

  • Level 1 · Mechanical room$92,000
  • Level 2 · Patient wing$118,000
  • Level 3 · Surgical suite$104,400
  • Roof · AHU connections$52,000
  • CO-013 Re-route chilled water$21,900

Contract + CO$388,300

Costing · what crews are measured on

  • 210 - Pipe insulation$148,000
  • 320 - Duct wrap$96,000
  • 410 - Jacketing$54,000
  • 510 - Firestopping$22,000

Cost budget$320,000

Wing B: contract $366,400 plus CO-013 $21,900. The difference between the two totals is the margin the job was bid at. Fictional sample company and data.

The details that keep codes clean

Spec labels: area, system, phase

Every cost code can carry labels for area, system, phase, module and component. You keep one short list of codes, and the reports still slice a big job the way the drawings do. The Earned vs Burned report groups by any of them, so Wing B can be read by floor or by system with the same data.

Cost codeArea / systemAreaSystemPhaseModuleComponent
Earned vs burned →

Required on the phone

Turn on one setting and a foreman can't submit a mobile timesheet without a cost code. The office can still split or correct codes when the week is approved.

GL category and item

Each code can carry a GL category and item, so job costs and your books describe the same money in their own terms.

QuickBooks Online →

Value, cost and margin

A code holds its value, quantity and unit, total cost, contingency and margin. That is the budget the job cost report and the forecast measure against.

Archive, don't delete

Retire a code from a template or a job without losing the history booked to it. Restore it if the scope comes back.

Set up a job by asking

Appello works natively with Claude, ChatGPT, Microsoft Copilot and Grok through the Appello connector (MCP). The assistant can apply a template, find codes with no budget or explain what landed on a line, limited to what your Appello role allows. Sample answers use the fictional jobs.

Works inside your Appello role. Every call is logged. Anything that leaves the business waits for a person. You can delegate the work, not the responsibility.

  • “Apply our standard insulation cost codes to the new Fairview job.”

    Done once you confirm: the 'Mechanical insulation, new build' template added its codes to Fairview Clinic · Mechanical Insulation, with values at zero, ready for the estimate.

    apply_cost_code_template

  • “Which open jobs have cost codes with no budget?”

    A list of jobs and the codes on each with no total cost set, so the PM can fill them in before the first timesheets land.

    search_cost_codes

  • “How much has gone onto jacketing on Wing B, and from where?”

    410 Jacketing has $33,700 of actual cost against a $54,000 budget as of August 31, split between approved labour and supplier bills, with the rows behind each.

    get_job_cost_report

6 → 1

systems to run the business

R.A. Barnes Electrical, London, Ontario

Codes only work when everything lives in one place

A cost code list falls apart when timesheets, bills and equipment live in different apps. R.A. Barnes Electrical moved scheduling, timecards and communication out of six systems and into Appello. Their film is about running the business on one system, not about cost codes, but it's why codes stay clean.

Watch the R.A. Barnes Electrical story

Questions about cost codes

Can we keep the cost codes we already use?

Yes. In Appello, you build your list once as a cost code template in Settings, with your own numbers and names, and apply it to each new job. If your list lives in a spreadsheet today, the Appello connector can bulk-create the codes from it, so nobody types two hundred lines by hand.

Does every job have to use the same codes?

No. In Appello, the template is a starting point. Apply it, then add, rename or archive codes on that job when the scope is different. Most contractors keep one template per kind of work, for example one for new construction and one for service, so the reports still compare like with like.

Where do costs come from once a job has codes?

From the work your people already record. In Appello, approved timesheet hours split across cost codes, supplier bills and employee expense lines are coded to the job and the code, and equipment time, per diems, labour true-ups and stock moved to the job land on codes too. Nothing is retyped into a cost report.

Can a crew skip the cost code on a timesheet?

Not if you say so. In Appello, an instance setting makes a cost code required on mobile timesheets, so a foreman can't submit the day without picking one. On the web, office staff can split or correct the codes when they approve the week.

Do cost codes replace our chart of accounts?

No. In Appello, cost codes sit under the job and say which scope a cost belongs to. Your chart of accounts stays in your accounting system. Each cost code can carry a GL category and item, so job costs and your books describe the same money in their own terms.

Can I group codes by area, system or phase?

Yes. In Appello, each cost code can carry spec labels for area, system, phase, module and component. The Earned vs Burned report can then group the same job by any of those, so you can read a hospital wing floor by floor or system by system without a second set of codes.