Cost code time tracking for construction
Every hour on the cost code where it was spent
Appello is cost code time tracking for construction crews. Workers split their day across the job's cost codes on the phone, foremen do it for the crew in bulk entry, and once the week is approved the labour lands on those codes in job cost. It's live today, for the people who do the work and the people who price it.
R. Singh · Thu, Sep 10 · 26-014-01 Lakeshore General · Wing B
10.00 hrs
60% of the day's labour goes to 210 Pipe insulation
40% goes to 410 Jacketing, which is only half done
Averaged labour hides the line that's losing money
When a timesheet only says “Lakeshore, 10 hours,” someone spreads the labour across the budget by feel. Jacketing looks fine until the job closes. Hours on the code they were spent on show the problem while there's still time to fix it.
- Hours by job, split by the PM at month-end
- Hours by cost code, split by the person who did the work, that day
Averaged across the job
- 21025%
- 32025%
- 41025%
- 51025%
Split by the worker
- 21060%
- 3200%
- 41040%
- 5100%
Share of R. Singh's Thursday labour by cost code. Fictional data.
Split Thursday, then follow the money
Move a quarter-hour at a time between the job's codes. The phone tells the worker when the day is covered, and the table shows where the labour will land once the day is approved.
Timesheet · R. Singh
Assign Cost Codes
Thu, Sep 10 · 26-014-01 Lakeshore General · Wing B
- 210 Pipe insulation6.00
- 320 Duct wrap0.00
- 410 Jacketing4.00
- 510 Firestopping0.00
Where R. Singh's Thursday lands once it's approved
10 hrs · labour $576.40
| Cost code | Hours | Share | Labour |
|---|---|---|---|
| 210 Pipe insulation | 6.00 | $345.84 | |
| 320 Duct wrap | 0.00 | $0.00 | |
| 410 Jacketing | 4.00 | $230.56 | |
| 510 Firestopping | 0.00 | $0.00 |
Labour on the line is priced first: 8 hrs at 1x and 2 at 1.5x for a Region 1 journeyperson. Then it's spread across the cost codes by hours, so 6 of 10 hours on pipe insulation puts 60% of the day's labour on code 210. Board, parking and travel on the line follow the same split.
Fictional rates and codes. In Appello the codes are the ones on the job, and the labour comes from your agreement's rates for the worker's trade level.
Three places to put hours on a code
- 1
On the phone
Assign Cost Codes
After clocking out, the worker splits the day across the job's codes in a step of its own. Turn on the requirement and the phone won't submit until the hours are on codes.
- 2
On the web timesheet
Split by Cost Code
A supervisor or payroll opens the line, presses Split by Cost Code, and adds a row per code with its hours. Handy for fixing a day before approval.
- 3
In foreman bulk entry
Codes for the crew
The foreman picks codes as they enter the crew's week. If the codes add up to more than the day, the grid says so: Cost codes exceed the day.
Clock-in and clock-out come from the time clock app; the crew's grid is foreman bulk entry.
The codes come from the job, so the field only sees the right ones
Typed onto the job
Add codes to the job's cost code list by hand, for a small job or a one-off.
Copied from a template
Keep a cost code template for each kind of work and copy it onto a new job in one step.
Built from the estimate
Generate the job's codes from the estimate, one per estimate line, so the budget and the field use the same list.
Want every hour on a code? Turn on Require Cost Code Allocation, under Cost Code Allocation Control in settings, and a timesheet submitted from the mobile app needs its hours on codes first. The office can still fix a line by hand before approval. More on setting codes up: job costing.
Cost Code Allocation Control
Applies when submitting a timesheet from the mobile app.
Approved on Friday, on the budget on Friday
Once a day is approved, its labour, board, parking and travel go to the line's cost codes by hours. The same numbers show in budget vs actual, earned vs burned, the monthly cost report and cost to complete, so a PM sees jacketing slipping in week three, not at closeout.
Earned vs Burned for 26-014-01, grouped by cost code. App screens use a fictional sample company.
Payroll at a union insulation contractor
3 → 1
people running payroll at Vanos Insulations, a union mechanical insulation contractor
Ask your AI
Ask where the hours went
Add the Appello connector to Claude, ChatGPT, Microsoft Copilot and Grok and sign in on Appello's own login page. Your assistant gets 800+ tools, and every answer is limited to what your Appello role allows.
Which timesheets last week have hours with no cost code?
Reads last week's timesheet lines and their cost-code splits, and lists the workers and days with hours left off a code.
search_timesheetssearch_timesheet_detail_recordsHow many hours went to jacketing on Lakeshore Wing B this month, against budget?
Finds the job's cost codes, then reads the job cost report and earned vs burned for code 410: hours, labour cost, budget and percent complete.
search_cost_codesget_job_cost_reportget_earned_vs_burnedMove 4 of R. Singh's Thursday hours from duct wrap to pipe insulation.
Shows the line's current split and the new one, then reallocates the hours once you confirm. Both codes have to be on the same job.
get_timesheetallocate_time_to_cost_codes
Tool names are the connector's own; your assistant picks them. Works inside your Appello role. Every call is logged. Anything that leaves the business waits for a person. You can delegate the work, but not the responsibility for it.
Questions about cost-code time
Can one worker's day be split across several cost codes?
Yes. In Appello, the hours on a timesheet line can be split across as many of the job's cost codes as the day needs: six hours of pipe insulation and four of jacketing, say. The worker does it in the Assign Cost Codes step on the phone, the office does it with Split by Cost Code on the web timesheet, and a foreman can pick codes in bulk entry.
Can we make cost codes mandatory?
Yes. In Appello, the Require Cost Code Allocation setting means a timesheet submitted from the mobile app has to have its hours on cost codes. Office entry and bulk entry don't enforce it, so a supervisor can fix a line before approval.
Can the cost codes come from our estimate?
Yes. In Appello, you can type them onto the job, copy them from a cost code template you keep for that kind of work, or generate them from the estimate, one cost code per estimate line. Workers only see the codes on the job they're working, so nobody books time to a code from another site.
Does the labour cost follow the hours?
Yes. In Appello, once hours are approved, the labour cost on the line, plus any board, parking and travel, is spread across its cost codes in proportion to the hours on each. That's what feeds earned vs burned, the monthly cost report and cost to complete, so the budget moves the day the week is approved.
Does this replace our accounting or job cost system?
No. In Appello, hours by cost code are the labour side of job cost. Your accounting system keeps the books, and the approved payroll week still goes to the payroll system you run today. If you use QuickBooks Online, Appello's integration keeps jobs and costs in step.
Can a foreman fix cost codes for the whole crew?
Yes. In Appello, foreman bulk entry lets one person enter the crew's week and pick cost codes as they go, and it warns when the codes add up to more than the day. Supervisors can also open any single line and use Split by Cost Code before approving it.
Do workers see every cost code in the company?
No. In Appello, the phone only offers the cost codes on the job the worker is clocked into. A job with four codes shows four, so the choice takes seconds and hours can't land on another job's budget by mistake.
Where cost-coded hours go next
Part of Appello's union timesheet software, with union payroll pricing every line.
Bring a job's cost codes. We'll split a real week.
Send us a cost code list and a week of hours. In the demo you'll see the crew split their days and the labour land on your budget lines.
Book a cost-code demoA working session on your own week: your crews, your payroll rules, your jobs. Pricing for your team size afterwards.
- I want to know where we standTake the 6-minute readiness scorecardScores payroll, job cost, scheduling, safety and how connected your systems are, which is the groundwork AI needs. You see your score in each area and a demo agenda built from your answers.
- I'm researching AIRead the AI agents white paperAI Agents in Construction: what agents can do for a trade contractor today, what has to be in place first, and the practical next steps.
- I want the big pictureSee how Appello connects AIHow your operations data, your integrations and assistants like Claude and ChatGPT fit together.